This article applies to the Barracuda PST Enterprise version 5.1 or higher.

Use the steps outlined in this article if you are upgrading to Barracuda PST Enterprise version 5.2 or higher from earlier versions.

If you planning to upgrade to version 5.2 and are currently running Copy to Message Archiver policies, the Barracuda Message Archiver must have firmware version 5.0 or higher. If you are not running Barracuda Message Archiver version 5.0 or higher, do not upgrade at this time.

If you are already running version 5.1, perform an in-place upgrade to version 5.2; do not uninstall the existing version of PST Enterprise. This ensures the existing configuration is maintained during the upgrade procedure.

If you are not currently running version 5.1, upgrade to the first version before proceeding to: Upgrading to PST Enterprise Version 5.1 by Uninstalling and Reinstalling

On the PST Enterprise server:

  1. Download the Barracuda PST Enterprise Installation Package to your server.
  2. Right-click PSTEnterprise.<version>.exe , and click Run as administrator.
  3. The installation wizard launches and the License Agreement page displays. Read the license, select I accept the terms in the license agreement if you agree, and click Next to proceed:
    PSTEUpgrade1.PNG
  4. The installer detects the existing installation and notifies you that this will be upgraded if you proceed. Click Next to confirm you want to upgrade the existing components:
    PSTEUpgrade2.PNG
  5.  The installer runs prerequisite checks to ensure the system is suitable for upgrade. Click Next to proceed:
    PSTEUpgrade3.PNG
  6. The installation summary displays. Click Install to start the upgrade process:
    PSTEUpgrade4.PNG
  7. While the upgrade is in-progress, the current status displays:
    PSTEUpgrade5.PNG
  8. Once complete, click Finished to close the installer. Any errors or warnings display on the status screen; click on the displayed link for advice on resolving any issues.
    1. if required, click Save Logs to save a copy of the installation logging to C:\PSTEnterpriseInstallLogs:
      PSTEUpgrade6.PNG
  9. If you are using Copy Agent server(s), perform an in-place upgrade on these machines in the same manner.

Processing can now proceed on the upgraded system.