It seems like your browser didn't download the required fonts. Please revise your security settings and try again.
Barracuda Yosemite Server Backup

How can I make all backup jobs run at the same time or one right after another in Yosemite Server Backup?

  • Type: Knowledgebase
  • Date changed: one year ago
Solution #00005575

Scope:

This solution applies to Yosemite Server Backup Firmware 8.0 and above.

Answer:

To configure the order of multiple jobs you must create a Job Group:
  1. Go to Jobs and Media and right-click in the blank area in the right-pane.
  2. Select New > Job Group.
  3. Here you can choose the manner in which the jobs will run:
    • Concurrently: If you want all jobs to run at the same time.
    • Sequentially: If you want one job to run after another.
  4. Next, choose the behavior for if the job fails:
    • Stop: Will stop the execution of further jobs from running should the preceding one fail.
    • Continue: Should one job fail the proceeding jobs will continue to run.
  5. To add jobs to the group, click on the Add button.
  6. To specify the order in which you'd like them to run, highlight a job and Move up or Move down in the list.
The configuration section allows you to schedule the timing of when the jobs in the job group will kick off.
The rotation section has no actual bearing on the job group.

Link to this page:
https://campus.barracuda.com/solution/50160000000ITQEAA4